The month of August started so strong. Floors were tiled, then hardwood was installed, then the millwork went in and then the countertops!



All of that sounds amazing but what we don’t talk about is the amount of time the house still sat untouched this month. Tile was done in three days; hardwood was another three days; millwork was one day and counters were in within a few hours. After that, nothing.
We expected trades to be working simultaneously on the inside and outside of the house since we have repeatedly communicated to our builder that our landlord is not extending the lease and we need to move out by the end of September. Still, a balcony needs to be built, covered deck needs to be finished, we haven’t chosen our stucco color, we are missing interior and exterior doors, septic has to be delivered and installed, showers need to be tiled, electrical and plumbing need to be connected, and countless other stuff that could have been done in the days that our house sat empty.
Needless to say that with all of the excitement at the things that we do see come together, we are beyond stressed. We’re trying to remain optimistic but the reality of the situation is starting to kick in and we are losing some much needed sleep over it.
I hope to give you a much more positive update next month!!! Until then, here’s a glimpse of our exterior elevation in its current unfinished state – I am beyond in love with our front door pillars!